Published · Updated · Reviewed by Karthikeyan E

A small home in Coimbatore has two sensible options: a 1 kW system at Rs 51,400 after subsidy or a 2 kW at Rs 85,000. Which one, and whether either is worth it, depends on one number: the units on your two-month EB bill. Below 400 units neither pays back in a reasonable time. We would rather say that here than on a site visit.
| 1 kW | 2 kW | |
|---|---|---|
| Our price | Rs 86,400 | Rs 1,55,000 |
| Subsidy (central + Tamil Nadu) | Rs 30,000 + Rs 5,000 | Rs 60,000 + Rs 10,000 |
| You pay | Rs 51,400 | Rs 85,000 |
| Shadow-free roof needed | About 100 sq ft | About 130 to 150 sq ft |
| Panels | 2 of 540 to 555 W | 4 of 540 to 555 W |
| Units made in two months | About 330 | About 660 |
| Network charge per bill | About Rs 93 | About Rs 185 |
| Suits a home using | 400 to 500 units in two months | 600 units and above |
Prices are our current quotes within 50 km of the city and include the panels, inverter, structure, wiring, earthing and the net-meter paperwork. The 1 kW system page and the 2 kW system page list what is in each.
Take the last two or three EB bills and read the units, not the rupees. Homes are billed once in two months. If the figure is 500 or less, the first 200 units are free since May 2026; above 500 only the first 100 are free and the rates climb slab by slab. That rule decides everything below, and it is explained in our 2026 tariff table.
Bills are energy charges for two months at 2026 rates. The "after" figure is the bill on the units you still draw from the grid, plus the network charge. A 1 kW system makes about 330 units in two months here, a 2 kW about 660.
| Units in two months | Bill now | 1 kW: bill after | 1 kW: payback | 2 kW: bill after | 2 kW: payback |
|---|---|---|---|---|---|
| 200 | Rs 0 | Rs 93 | Never | Rs 185 | Never |
| 300 | Rs 470 | Rs 93 | About 23 years | Rs 185 | About 50 years |
| 400 | Rs 940 | Rs 93 | About 10 years | Rs 185 | About 19 years |
| 500 | Rs 1,570 | Rs 93 | About 6 years | Rs 185 | About 10 years |
| 600 | Rs 2,880 | Rs 422 | About 3.5 years | Rs 185 | About 5 years |
| 700 | Rs 3,825 | Rs 892 | About 3 years | Rs 185 | About 4 years |
| 800 | Rs 4,770 | Rs 1,474 | About 2.6 years | Rs 185 | About 3 years |
Three things stand out. Under 400 units the system costs more than it saves. Between 400 and 500 units a 1 kW works and a 2 kW over-produces. From 600 units the 2 kW pays back in about five years, and the 3 kW system becomes the one to compare it with.
Two rules pull against a small system. The first 200 units are already free, so panels that cover them save nothing. The units above that are charged at Rs 4.70, the lowest slab, so each unit the roof replaces saves only Rs 4.70. And the network charge is paid on every unit the system makes, whether you needed it or not. A home on 300 units saves Rs 377 a bill with a 1 kW system; the system costs Rs 51,400. That is 23 years.
A home that uses 400 to 500 units in two months, with about 100 sq ft of roof clear of shade from 10 am to 3 pm. Two panels of 540 to 555 W and a small inverter. It brings the bill to the network charge and the payback is six to ten years. It does not run anything during a power cut; no grid-tied system does.
A home at 600 units and above, with 130 to 150 sq ft of clear roof. Four panels. From 600 units it wipes the energy charge; from 800 units the payback is about three years. Below 600 units it makes more than you use, and under net metering the unused credit is cancelled on 31 March every year. Oversizing is the most common mistake we see on small homes. The rule is in our guide to how exported units are credited.
| Item | What to expect |
|---|---|
| Network charge | 20% of Rs 1.53 on every unit the system makes. About Rs 93 a bill for 1 kW, Rs 185 for 2 kW. |
| Net-meter registration | Rs 500, once, with the application to TNPDCL. |
| Fixed charge | None. The domestic tariff has no fixed charge. |
| Cleaning | A wash every few weeks in dusty areas. Two or four panels take ten minutes. |
Grid-tied is the default and the only type the subsidy is calculated on. Off-grid means no connection to TNPDCL and a battery bank sized for the whole house, which is a farm or remote-site answer, not a town-home one. Hybrid keeps the grid and adds a battery for power cuts; the battery is paid by you in full. The three are described on our services page. If you live in a flat with a shared roof, read what applies to apartments first.
To run the sums on your own units, use the calculator. The subsidy steps are on the rooftop subsidy page.
Yes, if the inverter and the net-meter sanction are sized for it from the start. Tell the installer at the first visit that you plan to expand. Adding later means a fresh application for the extra capacity.
The central share is 60% of the benchmark cost for anything up to 2 kW, which works out to Rs 30,000 for 1 kW and Rs 60,000 for 2 kW. Tamil Nadu adds Rs 5,000 and Rs 10,000. Both are paid into your bank account after the net meter is fixed.
From about 600 units in two months, yes, apart from the network charge. Below that it makes more than you use, and the surplus credit is wiped on 31 March every year, so you paid for units you never get back.
Not for the bill. A grid-tied system without a battery is the cheapest and the only kind the subsidy is calculated on. A battery makes sense only if power cuts in your area last for hours and you must run something through them.
Bills and payback were worked out on 6 October 2026 from the orders above and our price list, using 5.5 units per kilowatt per day for Coimbatore. Your roof, shade and usage will move the figures. RK Solar Solutions is an installer, not a government agency.
Not sure which band you are in? Send us your last two EB bills and we will reply with the size, the net price and the payback in writing, or tell you to wait.
Quick Links
Get In Touch
R k solar solutions 15-1, venkatachalapathy nagar, Koraithottam, Avarampalayam, Coimbatore -641006 GST NO : 33AWRPK5780A1ZH
rksolarsolutions@gmail.com
+91 98651 94406
Newsletter
© CTSV Solutions Private Limited. All Rights Reserved.